Stona.info

Eco-Friendly Mining Model Plan Format

1.OVERVIEW OF THE AREA
1-1General information :
a. Name of lessee
b. Address of lessee
c. Phone No.
d. Status of the lessee:
Individual / Company
e. Details of the Area
f. District and State
g. Tehsil
h. Village
i. M.L.No.
j. Area (may be shown on map): -------- Hect.
k. Whether area falls in forest?
l. Lease period
1-2 General Topography :
a. G.T. Sheet No.
b. Description of FRP of the lease
c. Longitude and Latitude of nearest FRP (if available)
d. Nearest Railway Station
e. Land Status: Pvt. / Govt.
f. Details of forest area adjoining to the lease
g. Ground water level in the region
1-3 Availability of basic infrastructure :
Road
Electricity
Telephone
Water Supply
Dispensary
Post Office
School
1-4 Details of Abadi nearby mining area
1-5 Plantation in the area :
a. Number of plants naturally existing in the lease area
b. Plants to be grown (Location should be shown in the map: No. per year
1-6 Condition of top soil cover and its present use :
a. Depth of top soil
b. Details of place for stacking the top soil (may be shown in map)
c. Details of re-use of top soil
1-7 Existing Nalas, Water Bodies, Channels in the lease hold area and nearby : (may be shown in map)
Nala
River
Ponds
Water Channel
Others
1-8 Do you propose to carry out mining operations upto the water table

2 SURFACE MANAGEMENT PLAN
2-1 Pattern of stacking top soil for future use
2-2 Details of approved / declared dumping site
2-3 Effects of dumping on mineral zone and natural water channel / stream
2-4 Back filling of land and leveling of surface
2-5 Rehabilitation of dumps by creating contour bunds and filling them with soil and leveling
2-6 Maintenance of dumps and monitoring

3 WATER MANAGEMENT
3-1 Present water scenario of area :
a. Availability of water in the mining area
b. Duration in which water is available
c. Details of dug wells in nearby mine areas
d. Recharging of water (if proposed)
3-2 Details of diversion of rain water from the mining area, if required (may be shown on the map)
3-3 Details of Obstruction of water channels and measures taken
3-4 Impact and measures of Mining / blasting on water sources as well as natural water channels in the area
3-5 Measures taken for minimizing Silting and contamination of water
3-6 Plan for mining water utilization in : (may be shown on the map)
a. Drinking and irrigation purpose
b. Artificial recharge
c. Water harvesting

4 AREA REHABILITATION

4-1 Details of storage of top soil in reusable form (may be shown on the map)
4-2 Details of stabilization of dumps after leveling
4-3 Details of plantation plan (may be shown on the map)
4-4 Details of group plantation on land allotted, if any
4-5 Details of measures for maintenance of plantation done in top soil / OB dump / boundaries / other places

5 AIR, NOISE AND WELFARE MEASURES
5-1 Plan for air, dust suppression
5-2 Measures taken for air / dust control as per permissible limit
5-3 Plan for noise level
5-4 Measures taken for noise level control
5-5 Welfare measures taken for mining laborers :

a. Drinking water
b. Sanitary condition
c. First Aid facility
d. Labour Health
e.Social Welfare and Upliftment
f. Child care facility


6 METHOD OF MINING (OPEN CAST / UNDERGROUND)

6-1 Bench Height
6-2 Bench width
6-3 Machinery used
6-4 Explosive used (if blasting done)
6-5 Details of crusher or any plant (if constructed within lease area)


7 PERMISSIONS FROM PCB / FOREST

7-1 Details of NOC received from PCB (if applicable)
7-2 Details of ECC received from MOEF (if applicable)

Signature of Lessee
Note:
1. For quarry licences existing in clusters combined eco-friendly mining plan would be prepared for the whole area by the Mines Department in consultation with the Quarry and Quarry holder will abide this plan in true spirit.
2. In case of any confussion lease holder may contact the concern Mining Engineer/AME for details.
3. No fees or other charges are required to be deposited for submission of Eco-friendly mining plan.
4. Lessee/Licence Holder should give as much information as he can give relating to Environment friendly mining.


  Search DirectoryMachinery & ToolsOur other sitesAbout Us NewsHome

© 2004 Chanakya Publicity. All Rights Reserved. Disclaimer 

Submit info home